All Project List

Apartments and Housing

Project 1

Construction of Flat at PNS Karsaz (Phase-II)
Location: Karachi
Year: 1979

Project 2

Construction of Flat at PNS Karsaz (Phase-I)
Location: Karachi
Year: 1979

Project 3

Construction of 208 Md OR Quarters at Karachi
Location: Karachi
Year: 1980

Project 4

Construction of 48 Single Bed Room Flats at NOR-I
Location: Karachi
Year: 1982

Project 5

Const of 160 Married OR Flats (Multi Storey) at Karachi
Location: Karachi
Year: 1984

Project 6

Const of 48 Gun Room Flats for Naval Officers, Islamabad
Location: Islamabad
Year: 1985

Project 7

Const of 80 Married OR Quarters at Karachi
Location: Karachi
Year: 1985

Project 8

Const of Accn for ISSB Det at Malir
Location: Malir Cantt
Year: 1987

Project 9

Const of 12xMOQs (24xBOQs) at Shaheen Rd Chaklala Rawalpindi
Location: Rawalpindi
Year: 1991

Project 10

Const of 5xBlocks of 6x 'D' Type Flats (T/S) Group-I at Lahore Cantt
Location: Lahore
Year: 1997

Project 11

Construction of 36 MOQs, Chaklala, Rawalpindi
Location: Rawalpindi
Year: 1991

Project 12

Const of 60 x Apartments/Garages at Walton Area Lahore
Location: Lahore
Year: 1998

Project 13

Const of 144 residential flats for Pakistan Navy, Karachi
Location: Karachi
Year: 1981

Project 14

Const of 8 Cabanas & a Restaurant at Keenjhar Lake Thatta
Location: Thatta
Year: 1985

Project 15

Construction of Safari Villas, at Bahria Town Rawalpindi
Location: Rawalpindi
Year: 2000

Project 16

Const of 36 Married Army Officers Flats, Rawalpindi
Location: Rawalpindi
Year: 1988

Project 17

Const of MOQ at Engrs Mess Rawalpindi
Location: Rawalpindi
Year: 1999

Project 18

Construction of Safari Apartments at Bahria Town, Rawalpind
Location: Rawalpind
Year: 2001

Bridges

Project 1

Widening of Lei Bridge and Connecting Roads near Jhanda Chichi at Rawalpindi
Location: Rawalpindi
Year: 1995

Project 2

Deck Slab & Diaphragms of Bhai Khan Bridge on Kharian - Rawalpindi Additional Carriageway
Location: Rawalpindi
Year: 2000

Project 3

Const of New Bridge Over Nullah Lei Chaklala Rawalpindi
Location: Rawalpindi
Year: 1998

Project 4

Construction of Bridge Over River Jhelum at Azad Pattan including Approach Roads
Location: Azad Pattan
Year: 2006

Project 5

Bridge Over Korang Nullah, at Bahria Town, Rawalpindi
Location: Rawalpindi
Year: 1997

Project 6

Const of Lei and Soan Bridges at Rawalpindi
Location: Rawalpindi
Year: 1999

Project 7

Rehabilitation of existing bridge over River Indus at Ghazi Ghat
Location: Ghazi Ghat
Year: 2002

Project 8

Rehabilitation of Existing Bridge Over River Sutlej Near Bahawalpur
Location: Bahawalpur
Year: 2003

Project 9

Rehabiliation of Bridge Over River Kunhar at Balakot Bridge on Mansehra - Naran Section (N-15)
Location: Mansehra
Year: 2006

Project 10

Construction of Baba Farid Bridge Over River Sutlej at Dhakpattan Connecting Minchinabad - Pakpattan
Location: Pakpattan
Year: 2010

Project 11

Girder Launching at Kahori Bridge
Location: Muzaffarabad
Year: 2010

Project 12

Girder Launching at Bhont Chowk
Location: Bagh
Year: 2011

Project 13

Girder Launching at Thuri Park
Location: Muzaffarabad
Year: 2012

Project 14

Rehabiliation of Ayub Bridge Near Havallian on KKH Road at KM 55+500 (N-35)
Location: Havallian
Year: 2011

Project 15

Girder Launching at Dollai Bridge
Location: Muzaffarabad
Year: 2013

Project 16

Girder Launching at Chanari Chakoti
Location: Muzaffarabad
Year: 2013

Project 17

Girder Launching at Chattar Kalas
Location: Muzaffarabad
Year: 2013

Project 18

Girder Launching at Tanga Chowk
Location: Rawalpindi
Year: 2014

Project 19

Girder Launching at DHA Islamabad
Location: Islamabad
Year: 2014

Project 20

Girder Launching at Chaklala Scheme 3
Location: Rawalpindi
Year: 2014

Project 21

Girder Launching at Benazir Bhutto Bridge
Location: Rahim Yar Khan
Year: 2014

Project 22

Girder Launching at Rustam Bridge
Location: Mardan
Year: 2014

Project 23

Girder Launching at DHA Islamabad
Location: Islamabad
Year: 2015

Project 24

Girder Launching at Rathor Bridge
Location: Mirpur
Year: 2015

Project 25

Girder Launching at Bajaur Sharbatti Bridge
Location: Batkhela
Year: 2015

Project 26

Girder Launching at Zeeshan Bridge
Location: Batgram
Year: 2015

Project 27

Girder Launching at Hullar Bridge
Location: Bagh
Year: 2016

Project 28

Girder Launching at Thota Bridge
Location: Muzaffarabad
Year: 2016

Project 29

Girder Launching at Qadirabad Bridge
Location: Sahiwal
Year: 2017

Factories Sheds

Project 1

Const of Storage Shed in Ord Depot Lahore Cantt
Location: Lahore
Year: 1993

Project 2

5 Sheds at POL Depot Bollhari Hyderabad
Location: Hyderabad
Year: 1990

Project 3

Sarah Textile (Pvt) Ltd Lahore
Location: Lahore
Year: 1994

Project 4

Const of P3C Ware House at ASD Mehran Karachi
Location: Karachi
Year: 1993

Project 5

Const of Certain Workshops Incl Allied Facilities at PN Dockyard Karachi
Location: Karachi
Year: 1997

Project 6

Construction of Agha Khan Foundation Helicopter Hanger Hanger Islamabad Airport, Islamabad
Location: Islamabad
Year: 2002

Hotels

Project 1

Rehab works of Hotels Intercontinental Lahore
Location: Lahore
Year: 1978

Project 2

Rehab works of Hotels Intercontinental Rawalpindi
Location: Rawalpindi
Year: 1979

Project 3

Rehab works of Hotels Intercontinental Karachi
Location: Karachi
Year: 1981

Project 4

Extension of Pearl Continental Hotel, Lahore
Location: Lahore
Year: 2010

Project 5

Rehab Works of 80 Rooms, Lahore
Location: Lahore
Year: 2011

Project 6

Civil Works at Pearl Continental, Gawadar
Location: Gawadar
Year: 2011

Project 7

Civil Works at Pearl Continental, Muzaffarabad
Location: Muzaffarabad
Year: 2011

Project 8

Construction of Hotel One Downtown, Lahore
Location: Lahore
Year: 2012

Miscellaneous Works

Project 1

Provn & Instl of Standby Generating Set for Qasim Fort Manora Karachi
Location: Karachi
Year: 1991

Project 2

Instl of 2x 375 KVA Standby Gen Set at Topi Pumping Station Rawalpindi
Location: Rawalpindi
Year: 1993

Project 3

Re-const of the Two Helipad and Const of PCC Link Road Near Grave Yard at Ormara
Location: Ormara (Balochistan)
Year: 1997

Project 4

Supply of Chlorinated sewage effluent from Chlorination Tank (07) to Golf Course Ph-VIII DHA, Karachi
Location: Karachi
Year: 1998

Project 5

Provn of Air-conditioning system, Freq Converter 40 KVA, Anti Static Earthing, Lighting etc Rawalpindi
Location: Rawalpindi
Year: 2002

Project 6

Const of accn for Estb Main Condition for FCS Radar 702-A in 510 Elect Base Wksp EME Rawalpindi
Location: Rawalpindi
Year: 2002

Project 7

Const of wall with grill, gate columns & gates around Bokhari Park, Ph-VII DHA
Location: Karachi
Year: 2000

Project 8

Providing Pre-cast, pre-stressed girders for Gymnasium of the Sport Centre at the Aga Khan Karachi
Location: Karachi
Year: 1998

Project 9

Prov of external electrification at POL Depot Bholari, Hyderabad
Location: Hyderabad
Year: 1988

Project 10

Camp Facilities for Jinnah Naval Harbour, Ormara, Balochistan
Location: Ormara (Balochistan)
Year: 1995

Project 11

Primary Sewage Treatment Plant at Phase VIII, Karachi
Location: Karachi
Year: 1997

Project 12

Construction of Safari Villas, at Bahria Town Rawalpindi
Location: Rawalpindi
Year: 2000

Project 13

Amenities Building for AgrEvo, Karachi
Location: Karachi
Year: 1997

Project 14

Improvement of Air Conditioning System of Operation Theatres at AFIC Rwp
Location: Rawalpindi
Year: 1998

Project 15

Construction of 5 Corps Mosque
Location: Karachi
Year: 1994

Project 16

Provision of External Services to 510 Radar Re-built Workshop Rawalpindi
Location: Rawalpindi
Year: 1993

Project 17

Construction of Park Lane Tower, Lahore
Location: Lahore
Year: In Process

Project 18

Construction of Faqir Plaza, Lahore
Location: Lahore
Year: In Process

Project 19

Construction of Halipad at PNAD Mauripur
Location: Karachi
Year: 1980

Project 20

Construction of Certain Facilities Building (Gp-III) Project Margala at PNAD Mauripur
Location: Karachi
Year: 1982

Project 21

Construction & Supply of Precast Concrete Manholes for Primary Sewerage Network Between Kh-e- Khalid and Kh-e-Faisal, Phase-VIII DHA Karachi
Location: Karachi
Year: 1999

Office Complex Buildings

Project 1

Const of HQ Office for SCO Rawalpindi
Location: Rawalpindi
Year: 1987

Project 2

Const of CSD Complex at Taxila
Location: Taxila
Year: 1986

Project 3

Addition/Alteration & Modification of Existing PNTS Buildings PN Dockyard Karachi
Location: Karachi
Year: 1986

Project 4

Completion of Incomplete Works at BRC Mess, Abbottabad
Location: Abbottabad
Year: 1989

Project 5

Const of Special Type Officers Mess at Rawalpindi
Location: Rawalpindi
Year: 1990

Project 6

Const of Naval Headquarters at Islamabad
Location: Islamabad
Year: 1997

Project 7

Const of Two Blocks of New Navy Heights each 18 Storey's at Karachi
Location: Karachi
Year: 1994

Project 8

Const of (Half Portion) of Extension Block I&II New Naval Headquarters Complex Islamabad
Location: Islamabad
Year: 1997

Project 9

Const of Gun Room Accn for 106 Under Training Offrs of PNEC
Location: Karachi
Year: 1990

Project 10

Special building in Coastal Areas and associated roads facilities etc
Location: Karachi
Year: 1996

Project 11

Repair/Renovation of MO Directorate GHQ Rawalpindi
Location: Rawalpindi
Year: 2003

Project 12

Constuction of Mobilink Switching Center 9 for PMCL at Plot # 3-M, Industrial Area Township Scheme, Lahore
Location: Lahore
Year: 2006

Project 13

Construction of Askari Commercial Bank Ltd Chaklala-III Rawalpindi
Location: Rawalpindi
Year: 2003

Project 14

Construction of Askari Commercial Bank Ltd Peshawar Road, Zahoor Plaza, Rawalpindi
Location: Rawalpindi
Year: 2001

Roads Interchanges

Project 1

MC-18-2004 Construction of Rigid Pavement at KM 1410-1424 on N-5
Location: N-5
Year: 2004

Project 2

CA No. 56-2003 Rehabilitation Of Rutted Section at Bakralla NC/SBC & After Dina Before Mansoor Bend (SBC) at KM 1450-1451 (SBC) & KM 1465-1468 (NBC/SBC) On N- 5
Location: N- 5
Year: 2004

Project 3

CA No. 57-2003 Rehabilitation Of Rutted Section After Mansoor Bend Before Dina & Sohawa (NBC) at KM 1452-1453 (NBC) & KM 1470-1473 (NBC) On N- 5
Location: N- 5
Year: 2004

Project 4

CA No. MC-25-2004 Construction of Rigid Pavement in Full Width at KM 1455-1467 (NBC) & KM 1467-1469+200 (SBC) on N-5
Location: N-5
Year: 2005

Project 5

CA No. MC-20-2004 Construction of Rigid Pavement at KM 1461-1463 & KM 1500-1501 (NBC) on N-5
Location: N-5
Year: 2005

Project 6

CA No. RH-02-2004 Construction of Rigid Pavement at KM 1422-1425 (SBC) & KM 1451-1453 (SBC) & 1433-1444 (NBC) on N-5
Location: N-5
Year: 2005

Project 7

MC-19-2004 Construction of Rigid Pavement at KM 1492-1494 on N-5
Location: N-5
Year: 2005

Project 8

CA No. PM-5604 Construction of Rigid Pavement at KM 1519-1522 (NBC) on N-5
Location: N-5
Year: 2006

Project 9

CA No. PM-5618 Construction of Rigid Pavement at KM 1519-1522 (SBC) on N-5
Location: N-5
Year: 2006

Project 10

CA No. PM-5621 Construction of Rigid Pavement at KM 1514+900 -1515+000 (SBC) on N-5
Location: N-5
Year: 2006

Project 11

CA No. RH-04-05 Construction of Rigid Pavement at KM 0+000 to 3+000 (SBC) Lahore Bypass
Location: N-5
Year: 2006

Project 12

EM-05-2005 Construction of Rigid Pavement at Km0+000 to 3+000 (NBC) Lahore Bypass and Loop 'A' from N-5 to M-2
Location: N-5
Year: 2006

Project 13

CA No. PM-5625 Rehabilitation of Truck Lane by Rigid Pavement at Lahore Bypass at KM 6+000 to 9+000 (NBC)
Location: N-5
Year: 2006

Project 14

CA No. PM-5627 Rehabilitation of Truck Lane by Rigid Pavement at Lahore Bypass at KM 6+000 to 9+000 (SBC)
Location: N-5
Year: 2006

Project 15

PM-5629 Construction of Rigid Pavement at KM 0+000 to 6+000 (SBC) Kala Shah Kaku Link Road Connecting M-2 Interchange to Toll Plaza N-5 Lahore Bypass
Location: N-5
Year: 2006

Project 16

CA No. EM-02-2005 Construction of Rigid Pavement at KM 1454-1544 (NBC & SBC) Near Chak Menhu Before and Between Tarakki Bridge and Toll Plazas (NBC) Before Tarraki Bridge (SBC) on N-5
Location: N-5
Year: 2006

Project 17

PM-5626 Construction of Rigid Pavement at KM 1522+102-1525 (SBC) Near Rawat on N-5
Location: N-5
Year: 2006

Project 18

PM-5631 Construction of Rigid Pavement at KM 3+000 to 6+000 Lahore Bypass
Location: N-5
Year: 2006

Project 19

PM-5632 Construction of Rigid Pavement at KM 0+000 to 3+000 (SBC) Lahore Bypass
Location: N-5
Year: 2006

Project 20

PM-5633 Construction of Rigid Pavement at KM 1560 (SBC) & KM 1456 & KM 1456 to KM 1458 (SBC) on N-5
Location: N-5
Year: 2006

Project 21

RH-03-2004 – Construction of Rigid Pavement at KM 1478-1481 (SBC) on N-5
Location: N-5
Year: 2007

Project 22

PM-5702 – Construction of Rigid Pavement Near Lehri at KM 1458+600 to KM 1460+666 & Near Mandra at KM 1499 to KM-1500 (SBC) on N-5
Location: N-5
Year: 2007

Project 23

PM-5704 – Construction of Rigid Pavement at KM 1440-1445 on N-5
Location: N-5
Year: 2007

Project 24

PM-202-07 – Construction of Rigid Pavement at KM 0+000 to 6+000 (NBC) Kala Shah Kaku Road Connecting N-5 Lahore Bypass
Location: N-5
Year: 2007

Project 25

Provision of Road Culverts & Drains for Submarine School Training Centre PNS Karsaz Karachi
Location: Karachi
Year: 1980

Project 26

Construction of Tarnol Fateh Jang Interchange at KM 2 on Islamabad - Peshawar Motorway (M-1)
Location: Fateh Jang
Year: 2007

Schools Hospitals

Project 1

Construction of Secondary School No. 2 H.R.F Taxila (P-711) Taxila
Location: Taxila
Year: 1986

Project 2

Const of Cambridge School "O" level (Pri-I Package) Karachi
Location: Karachi
Year: 2000

Project 3

Const of Secondary School for Pakistan Navy, Islamabad
Location: Islamabad
Year: 1988

Project 4

Conversion of PNS Hafeez into 100 Bedded Hospital at Islamabad
Location:Islamabad
Year: 1992

Project 5

Const of TCF School at Tarnol
Location: Tarnol
Year: 2000

Project 6

Const of TCF School at Dhamial, Rawalpindi
Location: Rawalpindi
Year: 2000

Project 7

Const of Secondary School Islamabad
Location: Islamabad
Year: 1996

Project 8

Contract No. EM-58/2004 – Construction of Environmental Sciences Block at Fatima Jinnah Women University Rawalpindi
Location: Rawalpindi
Year: 2006

Project 9

Establishment of Labs Environmental Sciences Block Fatima Jinnah Women University Rawalpindi
Location: Rawalpindi
Year: 2007

Project 10

Reconstruction of Govt Girls, Post Graduate College, Muzaffarabad
Location: Muzaffarabad
Year: 2012

Project 11

Construction of DHQ Hospital at Athmuqam (Main Hospital Building) Lot-1
Location: Athmuqam
Year: 2011

Project 12

Construction of DHQ Hospital at Athmuqam (Residential Unit, Masjid & External Works) Lot-2
Location: Athmuqam
Year: 2011

Project 13

Construction of A&E Complex at CMH Rawalpindi
Location: Rawalpindi
Year: 2015

Project 14

Construction of OPD Complex at CMH Rawalpindi
Location: Rawalpindi
Year: 2015

Project 15

Construction of TAS School at PNS Karsaz (School Complex Phase-II)
Location: Karachi
Year: 1983

Project 16

Construction of Certain Facilities For Specialist School (Civil Works) At PNS Karsaz
Location: Karachi
Year: 1980

Project 17

Construction of ND School (Phase-I) at PNS Karsaz
Location: Karachi
Year: 1980

Project 18

Construction of Signal School at PNS Karsaz (Group-B)
Location: Karachi
Year: 1980

Project 19

Construction of TCF Schools at Rawalpindi
Location: Rawalpindi
Year: 1999

Project 20

Construction of TCF Schools at Tarnol
Location: Tarnol
Year: 2000

Project 21

Construction of Mubarika Campus Phase 1, Naroval
Location: Naroval
Year: 2006

Project 22

Construction of Mubarika Campus Phase 2, Naroval
Location: Naroval
Year: 2009

Squash Courts

Project 1

Prov of Fitness Training Equipment for PN Squash Court Complex at Fleet Club Karachi
Location: Karachi
Year: 1992

Project 2

Construction of Two Squash Courts & Provision of TV Commentator Box at Pakistan Navy Squash Complex, Karachi
Location: Karachi
Year: 1991

Project 3

Const of Roshan Jehangir Squash Complex Karachi
Location: Karachi
Year: 1991

Project 4

Prov of Two Maple Hardwood Squash Courts Floor at NORE-I Karachi
Location: Karachi
Year: 1992

Project 5

Provn of Wooden Floor and Glass Wall to Squash Court at Gujranwala Cantt
Location: Gujranwala Cantt
Year: 1992

Project 6

Instl of Maple Wood Floor Complete at Squash Court, Prime Ministers House Complex Islamabad
Location: Islamabad
Year: 1993

Project 7

Armourcoat, fixing of Floors & Glass walls 4 Squash Courts at Sports Complex Islamabad
Location: Islamabad
Year: 1993

Project 8

Flooring and Glass Walls (Special Item For Squash Complex at Hayatabad)
Location: Peshawar Cantt
Year: 1993

Project 9

Floors Glasswall & Armourcoat at Aiwan-e-Sadr Islamabad
Location: Islamabad
Year: 1994

Project 10

Construction of One Squash Court at PNS Bahadur Karsaz Karachi
Location: Karachi
Year: 1996

Project 11

Remaining work at Qamar Zaman squash court at Qayyum Sports Complex Peshawar Cantt
Location: Peshawar Cantt
Year: 1998

Project 12

Const of Squash Court at PNS Karsaz for the additional item i.e. Hard Plaster Maple Floor and Front Sounding Board
Location: PNS Karsaz
Year: 1998

Project 13

Const of Squash Court at Chenab College Jhang
Location: Jhang
Year: 2007

Project 14

Provision of Maple Wood Flooring at Army Sports Gymnasium Rawalpindi
Location: Rawalpindi
Year: 2001

Project 15

Laying of Mapple Leaf Wood Floor of Squash Court at GHQ Rawalpindi
Location: Rawalpindi
Year: 2001

Project 16

Renovation of Roshan Khan Squash Courts at Pakistan Sports Complex Islamabad and GHQ Squash Compled Rawalpindi
Location: Rawalpindi
Year: 2001

Technical Building

Project 1

Const of Desto Lab, Karachi
Location: Karachi
Year: 1985

Project 2

Const of Additional Class Room and Labs by Addition/Altn Blocks (A&E) and (B&D) at PNS Jauhar Karachi
Location: Karachi
Year: 1989

Project 3

Const of Technical bldg Igloo Structures and ancillary facilities
Location: Karachi
Year: 1980

Project 4

Prov & Instl of Elect Sup System for Shore Supply Facilities for Gearing (Phase-III) at Dockyard, Karachi
Location: Karachi
Year: 1990

Project 5

Prov of Air-conditioning of Operation Room at Ormara
Location: Ormara (Balochistan)
Year: 1990

Project 6

Const of Under Ground Operation Room at Ormara
Location: Ormara (Balochistan)
Year: 1990

Project 7

T11 PTA Plant Pakistan, ICI Project NO. 00604, Karachi
Location: Karachi
Year: 1997

Project 8

Const of Shooting Range for SAF Games at Islamabad
Location: Islamabad
Year: 2001

Water Supply Work

Project 1

Const of RCC Overhead Water Tank of 50,000 Glns & pump house at Islamabad
Location: Islamabad
Year: 1983

Project 2

Const of Civil Works for Under Water Escape Trainer at PN Mehran Karachi
Location: Karachi
Year: 1996

Project 3

Prov of External Water Supply incl One Overhead Water Tank at SRC Hyderabad
Location: Hyderabad
Year: 1987

Project 4

Const of RCC Overhead Water Tank for 208 Qtrs at Karachi
Location: Karachi
Year: 1987

Project 5

Provn of Water Supply System at Ormara (Balochistan)
Location: Ormara (Balochistan)
Year: 1997

Project 6

Supply & laying of 36" Main Sewerage line at Masroor
Location: Masroor
Year: 1977